Field Solar Power Plant (SPP) Projects

PROJECTCLIENTFINISHED YEARIMAGE
Bolu Göynük 2,5 MW Unlicenced SPP Projectsİdare Adı ENCener1 Mühendislik Bilişim Enerji Yapı San. Ltd. Şti. - Cener2 Mühendislik Bilişim Enerji Yapı San. Ltd. Şti. - GC Enerji Bilişim Mühendislik Ltd. Şti.2017

UNLICENSED SOLAR POWER PLANT PROJECTS IN GÖYNÜK-BOLU

Project Place : Köybaşı Village, Göynük District, Bolu City
Investor : Cener1 Mühendislik Bilişim Enerji Yapı San. Ltd. Şti, Cener2 Mühendislik Bilişim Enerji Yapı San. Ltd. Şti, GC Enerji Bilişim Mühendislik Yapı San. Ltd. Şti.
Power : 2,5 MW (DC)
Type of Panel : Polycrystal 260 Watt
Inverter : SMA 25000TL
Project Dates - Inception/ Cutoff : August 2015 – September 2017

Project Summary :

The project for fi ve unlicensed solar power plants is carried out by CENER3 Engineering team on behalf of our company, Cener1 Ltd. Co. and Cener2 Ltd. Co. as our previous group companies within the context of the project. The investment was implemented with the credit by Halkbank. The processes below were completed as a consequence of works which were retained two years on lands that were bought:

  • Project development
  • Design and project approval by TEDAŞ (Turkish Electricity Distribution Corporation)
  • Institutional consideration and getting the planning permission
  • Completion of crediting works
  • Completion of the construction for the facility installation
Ankara - Sincan 4,4 MW Unlicenced SPP Project Development and Design MMA ENERJİ ÜRETİM A.Ş.2016

MMA ENERJİ ÜRETİM INC. SİNCAN-ANKARA UNLICENSED SOLAR POWER PLANT INVESTMENT – PROJECT DEVELOPMENT AND DESIGN WORKS

Project Place : Ücret Village – Sincan District – Ankara City
Investor : MMA Enerji Uretim Inc.
Installed Power : 4MW (4 x 999kW)
Type of Panel : Polycrystal 260 Watt
Inverter : SMA 25000TL
Project Dates - Inception / Cutoff: September 2015

Project Summary :

The processes below were carried out on a registered land on behalf of Yayla Enerji Üretim Turizm ve İnşaat Ticaret Inc. in Ücret Village of Sincan District in Ankara.

  • Project Development
  • Design and project approval by TEDAŞ (Turkish Electricity Distribution Corporation)
  • Completion of Institutional Consideration

After the planning permission is taken by MMA Enerji Uretim Inc., the process of constructing facility will be carried out by our team.

Elazig Province 7 MW Unlicenced SPP ProjectsHANWHA Q CELLS2018

HANWHA Q CELLS SOLAR ENERGY SYSTEMS INC. UNLICENSED SOLAR POWER PLANT INVESTMENT, PROJECT DEVELOPMENT 7X999KW (7 MW)

Project Place : Yalınız Village / Elazığ City
Investor : Meva Mühendislik Bilişim + FNT Gıda Turizm + Marel Bilişim Mühendislik + Serimer Optik
Installed Power : 7 MW (7x999kW)
Project Dates - Inception / Cutoff: 2015 May

Project Summary :

The project of seven unlicensed solar power plants, each of which has 999kW power, was planned by our team on a land which was registered by Cener3 Mühendislik Bilişim Yapı San. Ve Dış Tic. Ltd. Co. as our group fi rm in Yalınız Village of Elazığ City. After the process, the investor fi rms of which we participated were assigned to Hanwha Q Cells Solar Energy Inc. as the largest stakeholders of international market for solar energy.

PROJECTCLIENTFINISHED YEARIMAGE
Elazığ Tohumlu Lisanssız GES ProjesiAbdülbaki BAŞ2018

ELAZIĞ PROVINCE UNLICENCED SOLAR POWER PLANT - CONSTRUCTION WORKS

Location: Elazig Province Tohumlu Village
Capacity: 1 MW

Project Summary:

Design approvals and positive consent of required official administrations have been accomplished, land consolidation process is on going. Construction works are planned to be started after the completion of related process